Prefabrication process of pipe beveling machine

Mar 26, 2025

Leave a message

1. Each process of the pipe beveling machine must be carried out in accordance with the corresponding operating procedures. During the prefabrication process, an appropriate number of control points shown in the flow diagram should be set to ensure the quality of the prefabricated object.

2. Various inspections of pipe beveling machine parts according to the planned requirements, such as non-destructive inspection of welds, visual inspection of appearance, and pipe section conformity inspection (except pressure test), must be completed in the prefabrication plant.

3. During the prefabrication production process of the beveling machine, various inspection records should be made according to the different requirements of the pipeline grade. When the pipeline segment is put into storage, there must be a complete record of the pipeline segment.

4. Considering the convenience of transportation and installation during the operation of the pipe beveling machine, an adjustment section should be reserved. In order to improve the quality of pipeline equipment, reduce on-site welding joints, and speed up the construction progress, it is necessary to combine the site to maximize the operation of the pipe beveling machine during the prefabrication process.

Send Inquiry